BUILDWISE Inc proposes to furnish the material and work delineated according to architectural and structural plans and subject to terms and conditions herein.
Prevailing wage rate not included
Scope of Work
Including metal stringers ,precast concrete treads ,Qty-2 ea. mid landings ( concrete by others ) Stair rails, wall mount grab rails.Engineering included. Primer only
Per 3/AD4.1.2 with perforated panels . HDG, Primer only
Including separation beams ,guide rail columns, hoist beams ,pit ladders ,separation screen
Including Qty-2 ea. security gates ,with perforated panels, Guardrails on top of CMU, HDG ,primer only
No Details , budget only , Qty2 ea. , primer only
Per detail 3,4/SC410, Approx. 100 locations, Unknown Qty
Per details 22/AD3.1 Qty-3 ea. HDG, Primer only
Per detail 20 /AD2.3.1 HDG, Primer only
Qty-10 ea. Primer only Concrete filled by others
Exclusions
- 1.Any concrete work
- 2.Permit fees
- 3.Finish paint
- 4.Metalizing (galvanizing, zinc spray, etc.) unless specified
- 5.Cost of field inspection (welding, epoxy anchors, etc.)
- 6.Any plan submittals to the City
- 7.Items not included in this proposal
- 8.Demolition and disposal of any items
- 9.All exclusions provided in breakdown
- 10.Scaffolding
- 11.Gate hardware, openers and self closures unless specified
- 12.Roofing materials such as foam, roofing, waterproofing and flashing
- 13.Engineering unless specified
- 14.Powder coating unless specified
- 15.Louvered screen per 6/AD4.1.2